Design, Production & Delivery

12 Steps From Enquiry to Installation Guidance

Conveyor components fail for unglamorous reasons: a seal unsuited to the dust, a lagging unsuited to the tension, a coating unsuited to the climate. This process exists to catch those before a single tube is cut.

2–3 daysSample Lead Time
15–30 daysMass Production
MOQ 1Trial Orders Welcome
24 hQuotation Response
Phase 1 — Requirements & Design

Getting the Specification Right

STEP 01Client requirements confirmationFunctional layout, belt width, duty, area, style and material requirements — plus a design cost quotation and design agreement.
STEP 02Preliminary design developmentInitial concept drawings, floor layouts and elevations for your configuration.
STEP 03Design reviewOur technical team reviews feasibility and standards compliance before anything reaches you.
STEP 04Client confirmationPreliminary designs issued for your review; feedback folded into revisions.
Phase 2 — Engineering & Sign-Off

Locking the Details

STEP 05Detailed design developmentConstruction drawings covering structural, welding, coating and tolerance requirements.
STEP 06Technical confirmationMaterial grade, bearing brand, seal type, lagging and coating confirmed with you in writing.
STEP 07Quotation confirmationDetailed bill of quantities and quotation, followed by contract signing.
STEP 08Final confirmationYou sign the design approval form — that signed drawing becomes the production basis.
Phase 3 — Production & Delivery

Building, Testing and Shipping

STEP 09Production preparationTechnical department issues production drawings; procurement releases material.
STEP 10Factory inspectionFinal testing of dimensional accuracy, rotational resistance, coating and weld integrity before release.
STEP 11Packaging and shippingComponents packed to sea-freight requirements; logistics and documentation arranged.
STEP 12Installation guidanceOn-site installation drawings and technical support through commissioning.
Project Special Considerations

Four Things We Check Before Quoting

01

Local code compliance

Building and equipment codes differ by market — we design to the standard your site must satisfy.

02

Local voltage

Where motorized pulleys or driven units are involved, voltage and frequency are confirmed up front.

03

Climate design

Corrosion resistance, moisture protection, frost resistance and pest prevention matched to the local climate.

04

Duty extremes

High temperature, heavy load and corrosive conditions get their own material and coating specification.

Send Us Step 01 and We Will Handle the Rest

Belt width, duty condition and quantity. Quote within 24 hours, samples in 2–3 days, MOQ 1 piece.